Highways Department

Works Division

 

Agreement No. WD 7/2007

Upgrading of Remaining Sections of Kam Tin Road & Lam Kam Road

 

 

Environmental Impact Assessment Report

Volume 2 of 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Document No. C1022/EIA/001

Issue 3

 

February 2009

 

 

 

Mannings (Asia) Consultants Ltd

in association with BMT Asia Pacific Ltd

 

 


 

Agreement No. WD 7/2007

Upgrading of Remaining Sections of

 Kam Tin Road and Lam Kam Road

 

 

 

Environmental Impact assessment report
Volume 2 of 2

 

CONTENT

 

FIGURES

 

Figure 2.1

Location of the proposed Project

Figure 2.2

Locations of the Proposed Project Area Encroaches upon the Conservation Area

 

 

Figure 3.1

Locations of Representative Air Sensitive Receivers

Figure 3.2

Maximum Hourly NO2 Contours at 1.5 m above ground (µg/m3)

Figure 3.3

Maximum Daily Average NO2 Contours at 1.5 m above ground (µg/m3)

Figure 3.4

Maximum Daily Average RSP Contours at 1.5 m above ground (µg/m3)

 

 

Figure 4.1

Locations of Representative Noise Sensitive Receivers

Figure 4.2

Typical Cross Section of the Proposed Temporary Noise Barrier at NSR N27

 

 

Figure 5.1

Locations of Representative Water Sensitive Receivers

 

 

Figure 6.1

Locations of Potential Contamination Site Along Project Boundary

Figure 6.2

Locations of Proposed Sampling Locations

 

 

Figure 7.1

Study Area and Ecological Baseline Survey Locations

Figure 7.2

Habitat Map

Figure 7.3

Locations of Aquilaria sinensis

 

 

Figure 8.1

Locations of Pat Heung Sheung Tsuen Archaeological Site

Figure 8.2a

Locations of auger holes undertaken near the village of Wang Toi Shan Yau Uk Tsuen

Figure 8.2b

Locations of auger holes undertaken along Kam Tin Road

Figure 8.3

Pleistocene Debris Flow Deposits, Pleistocene Terraced Alluvium and Holocene Alluvium near Pat Heung

Figure 8.4

Pleistocene Debris Flow Deposits, Pleistocene Terraced Alluvium and Fine Grained Granodiorite near Sheung Tsuen

Figure 8.5

Pleistocene and Holocene Debris Flow Deposits and Granodiorite near Kwun Yam Keng

 

 

Figure 9.1

Preliminary Layout Plan

Figure 9.2

Landscape Resources

Figure 9.3

Location of Surveyed Trees

Figure 9.4

Landscape Character Areas

Figure 9.5

Landscape Character Area Photographs

Figure 9.6

Visual Envelope and Zone of Visual Influence

Figure 9.7

Visual Site Context

Figure 9.8

Review of Planning and Development Control Framework

Figure 9.9

Impact on Landscape Resources

Figure 9.10

Impact on Landscape Character

Figure 9.11

Visual Impacts

Figure 9.12

Design Concept Drawing and Recommended Landscape Mitigation Measures

Figure 9.13

Photomontage

Figure 9.14

Tree Recommendation Plan

Figure 9.15

Exploration of Alternative Schemes

 

 

 

 

 


FIGURES